Excavation Permit - (SF 69)
McGurran Civils Ltd
Brendan Mahoney
+ 1 other supervisor
Site Plan / emove tar from road and prep for kerbing Install gullies Excavate crane base Set manhole covers Move materials from block B footprint to block A location Move Volvo excavator to bottom of site Extend pipe from BH 03 behind kerb line If materials arrive on site
Zone 3 / emove tar from road and prep for kerbing Install gullies Excavate crane base Set manhole covers Move materials from block B footprint to block A location Move Volvo excavator to bottom of site Extend pipe from BH 03 behind kerb line If materials arrive on site
+ 1 other zones
07:00
29/06/2026
29/06/2026
18:00
29/06/2026
29/06/2026
Pending Approval